Search the Site with
|
USS PEARL HARBOR is the last of the United States Navy's four new cargo variants of the WHIDBEY ISLAND class of Landing Dock Ships and the first ship to carry the name Pearl Harbor to commemorate the heroic actions of the members of the armed services as well as the citizens of the Island of Oahu during the attack on December 7, 1941.
General Characteristics: | Keel laid: January 27, 1995 |
Launched: February 24, 1996 | |
Commissioned: May 30, 1998 | |
Builder: Avondale Industries, New Orleans, Louisiana | |
Propulsion system: four 16 cylinder Colt-Pielstick Diesel Engines | |
Propellers: two | |
Length: 610 feet (186 meters) | |
Beam: 84 feet (25.6 meters) | |
Draft: 20 feet (6 meters) | |
Displacement: approx. 16,500 tons full load | |
Speed: 22 knots | |
Well deck capacity: two LCAC or one LCU or four LCM-8 or nine LCM-6 or 15 amphibious assault vehicles (AAV) | |
Aircraft: none, but two landing spots allow for operation of aircraft as large as the | |
Crew: Ship: 24 officers, 328 enlisted Marine Detachment: 504 Marines | |
Armament: two | |
Cost: about $258 million | |
Homeport: San Diego, CA. |
Crew List:
This section contains the names of sailors who served aboard USS PEARL HARBOR. It is no official listing but contains the names of sailors who submitted their information.
USS PEARL HARBOR Cruise Books:
USS PEARL HARBOR Image Gallery:
The photos below were taken by Brian Barton and show the USS PEARL HARBOR at Naval Base San Diego on December 6, 2003.
The photos below were taken by me and show the USS PEARL HARBOR at Naval Base San Diego on March 10, 2008.
The photos below were taken by me and show the USS PEARL HARBOR at Naval Base San Diego on September 29, 2011.
The photos below were taken by me and show the USS PEARL HARBOR at Naval Base San Diego on October 3 and 11, 2012.
The photos below were taken by Lydia Perz and show the USS PEARL HARBOR at General Dynamics National Steel and Shipbuilding Co. (NASCCO), at San Diego, Calif., at the beginning of her Extended Drydocking Phased Maintenance Availability (E-DPMA). The photos were taken on May 3, 2014.
The photos below were taken by Michael Jenning and show the USS PEARL HARBOR at Huntington Ingalls Industries Continental Maritime of San Diego shipyard on December 27, 2014.
The photos below were taken by Michael Jenning and show the USS PEARL HARBOR at Naval Base San Diego, Calif., on October 2, 2015.
The photos below were taken by Michael Jenning and show the USS PEARL HARBOR at Naval Base San Diego, Calif., on April 18, 2016.
The photos below were taken by Sebastian Thoma and show the USS PEARL HARBOR at Naval Base San Diego, Calif., on December 20, 2016.
The photos below were taken by Michael Jenning and show the USS PEARL HARBOR undergoing a Selected Restricted Availability (SRA) at BAE Systems San Diego Ship Repair on September 28, 2018.
The photos below were taken by Michael Jenning and show the USS PEARL HARBOR undergoing a Selected Restricted Availability (SRA) at BAE Systems San Diego Ship Repair on March 2, 2019.